Cost model
Language: English Series: Building ; 263(8047) 10 July 1998, 56-63(8)Publication details: 1998Subject(s): Summary: Reviews the design, the availability of lottery funding and the cost of smaller sports buildings. Includes references, cost breakdown, plan and alternative element specifications.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS59003 (Browse shelf(Opens below)) | 1 | Available | 87503-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| ABS59000 Against all odds | ABS59001 Breaking the mould | ABS59002 Cheap chills | ABS59003 Cost model | ABS59004 Shedding new light | ABS59005 Where size is everything | ABS59006 Getting to know the building |
Reviews the design, the availability of lottery funding and the cost of smaller sports buildings. Includes references, cost breakdown, plan and alternative element specifications.