Stansted showcase for Egan`s reforms
Language: English Series: Construction News ; (6597) 7 January 1999, 18(1)Publication details: 1999Subject(s): Summary: BAA used the BRE`s Centre for Performance Improvement in Construction to monitor performance on the Stansted Satellite 2 air terminal, which was completed recently. The BRE used its Calibre monitoring system to identify non-productive time, wasted due to shortcomings in design and specification or management failings.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS59911 (Browse shelf(Opens below)) | 1 | Available | 90766-1001 |
BAA used the BRE`s Centre for Performance Improvement in Construction to monitor performance on the Stansted Satellite 2 air terminal, which was completed recently. The BRE used its Calibre monitoring system to identify non-productive time, wasted due to shortcomings in design and specification or management failings.