US high speed prefab system.
Series: Construction News ; (6635) 30 September 1999, 16(1)Publication details: 1999Subject(s): Summary: A new formwork system called ECO-Block is soon to be available in the UK. The system has been used in the US for two years, and consists of a series of pre-fabricated, expanded polystyrene blocks into which concrete is poured. The system is said to reduce construction times by a third, but as yet has no Agrement Certificate.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3538-07 (Browse shelf(Opens below)) | 1 | Available | 102801-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3538-04 Prime contracts. | WB3538-05 Construction costs steady. | WB3538-06 Tender prices. | WB3538-07 US high speed prefab system. | WB3538-08 Office parks | WB3538-08 Office parks | WB3538-08 Office parks. |
A new formwork system called ECO-Block is soon to be available in the UK. The system has been used in the US for two years, and consists of a series of pre-fabricated, expanded polystyrene blocks into which concrete is poured. The system is said to reduce construction times by a third, but as yet has no Agrement Certificate.