Image from Google Jackets

Bearing up

By: Series: Surveyor ; 188(5644) 16 August 2001, 20-21(2)Publication details: 2001Subject(s): Summary: Examines the method used to strengthen the Baydon Road over bridge over the M4. The work was carried out without having to close the M4 below.

Examines the method used to strengthen the Baydon Road over bridge over the M4. The work was carried out without having to close the M4 below.