Image from Google Jackets

Architects

Language: English Series: Estates Gazette Case Summaries ; (1994) EGCS 46(1) (19/3/94)Publication details: 1994Subject(s): Summary: "E H Cardy & Son v Edward Vye Taylor and Paul Roberts & Associates (a firm) (third party)" ORB 10 February 1994. The defendant hotelier was awarded damages for loss as C, a builder, had failed to conduct proper site measurements resulting in building delays, lower star-rating and subsequent forced sale of the finished hotel. The third party, a firm of architects, subcontracted by C to undertake design, was held to be liable in negligence.
Holdings
Item type Current library Call number Copy number Status Barcode
Law report London Journal article WB3012-32 (Browse shelf(Opens below)) 1 Available 10825-1001

"E H Cardy & Son v Edward Vye Taylor and Paul Roberts & Associates (a firm) (third party)" ORB 10 February 1994. The defendant hotelier was awarded damages for loss as C, a builder, had failed to conduct proper site measurements resulting in building delays, lower star-rating and subsequent forced sale of the finished hotel. The third party, a firm of architects, subcontracted by C to undertake design, was held to be liable in negligence.