Hazardous waste landfill sites unveiled
Series: RICS Rural Professional ; October/November 2002, 15(1)Publication details: 2002Subject(s): Summary: In the first phase implementation of the landfill directive around 220 of the 1 300 landfill sites across England and Wales have been nominated to become sites specialising in hazardous waste. To comply with the landfill directive and the requirements of the Integrated pollution prevention and control directive operators will have to obtain new operating permits and for sites receiving hazardous waste, this has to be completed by 16 July 2004. For a list of sites for which a conditioning plan has been accepted and landfills classified as able to accept 'hazardous waste': http://www.environment-agency.gov.uk/business/wasteman/landfill/351711| Item type | Current library | Copy number | Status | Barcode | |
|---|---|---|---|---|---|
| News article | London News article | 1 | Available | 120223-1001 |
In the first phase implementation of the landfill directive around 220 of the 1 300 landfill sites across England and Wales have been nominated to become sites specialising in hazardous waste. To comply with the landfill directive and the requirements of the Integrated pollution prevention and control directive operators will have to obtain new operating permits and for sites receiving hazardous waste, this has to be completed by 16 July 2004. For a list of sites for which a conditioning plan has been accepted and landfills classified as able to accept 'hazardous waste': http://www.environment-agency.gov.uk/business/wasteman/landfill/351711