Out of the past
Language: English Series: New Civil Engineer ; (1635) 24/31 August 2006, 20-21(2)Publication details: 2006Subject(s): Summary: Explains how resurrecting the abandoned Victorian Kingsland Viaduct will aid the delivery of the East London Line extension. The work will involve laying new rail along the viaduct from a new station at Dalston, linking into the existing East London Line at Shoreditch. The line will also be extended south from New Cross to Crystal Palace and a total of 21 bridges will need refurbishment or replacing.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L134718 (Browse shelf(Opens below)) | 1 | Available | 134718-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Explains how resurrecting the abandoned Victorian Kingsland Viaduct will aid the delivery of the East London Line extension. The work will involve laying new rail along the viaduct from a new station at Dalston, linking into the existing East London Line at Shoreditch. The line will also be extended south from New Cross to Crystal Palace and a total of 21 bridges will need refurbishment or replacing.