Dealing with delay claims
Language: English Series: Contract Journal ; 440(6643) 19 September 2007, 48(1)Publication details: 2007Subject(s): Summary: Examines revisions in the JCT Standard Building Sub Contract (2005). Subcontractors now need to provide much more detail of all their claims. Previously they had been able to simply provide a gross figure. Also considers extension of time claims, late performance or failure to perform by the subcontractor.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L140818 (Browse shelf(Opens below)) | 1 | Available | 140818-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Examines revisions in the JCT Standard Building Sub Contract (2005). Subcontractors now need to provide much more detail of all their claims. Previously they had been able to simply provide a gross figure. Also considers extension of time claims, late performance or failure to perform by the subcontractor.