Mountain rescue
Language: English Series: RIBA Journal ; 115(2) February 2008, 52-58(6)Publication details: 2008Subject(s): Summary: Reports on the design, architecture and costing of Everest Community College in Basingstoke. Contains brief building costs, layout plans and specifications. The total cost was £21 532 368.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L142324 (Browse shelf(Opens below)) | 1 | Available | 142324-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Reports on the design, architecture and costing of Everest Community College in Basingstoke. Contains brief building costs, layout plans and specifications. The total cost was £21 532 368.