Lead times Nov 2007-Feb 2008
Language: English Series: Building ; 273(8516) 15 February 2008, 68-69(2)Publication details: 2008Subject(s): Summary: Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between November 2007 and February 2008 saw a return to more normal lead times, with eight packages reducing their lead times and only four reporting a rise. This is partly due to the number of major projects being deferred or delayed.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L142627 (Browse shelf(Opens below)) | 1 | Available | 142627-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between November 2007 and February 2008 saw a return to more normal lead times, with eight packages reducing their lead times and only four reporting a rise. This is partly due to the number of major projects being deferred or delayed.