Image from Google Jackets

Integrated probabilistic schedules and estimates from project simulated data

By: Contributor(s): Series: Construction Management and Economics ; 19(4) July 2001, 417-426(10)Publication details: 2001Subject(s): Summary: Suggests that the risks associated with construction projects can be better quantified by integrating range estimating and probabilistic scheduling, also known as probabilistic estimating and stochastic scheduling, using the empirical cumulative density function technique (ECDF), a graphically based technique which does not require assumptions about the underlying data distributions. Tables, diagrams, references.
Holdings
Item type Current library Copy number Status Barcode
Journal article London Journal article 1 Available 113335-1001

Suggests that the risks associated with construction projects can be better quantified by integrating range estimating and probabilistic scheduling, also known as probabilistic estimating and stochastic scheduling, using the empirical cumulative density function technique (ECDF), a graphically based technique which does not require assumptions about the underlying data distributions. Tables, diagrams, references.