Integrated probabilistic schedules and estimates from project simulated data
Series: Construction Management and Economics ; 19(4) July 2001, 417-426(10)Publication details: 2001Subject(s): Summary: Suggests that the risks associated with construction projects can be better quantified by integrating range estimating and probabilistic scheduling, also known as probabilistic estimating and stochastic scheduling, using the empirical cumulative density function technique (ECDF), a graphically based technique which does not require assumptions about the underlying data distributions. Tables, diagrams, references.| Item type | Current library | Copy number | Status | Barcode | |
|---|---|---|---|---|---|
| Journal article | London Journal article | 1 | Available | 113335-1001 |
Suggests that the risks associated with construction projects can be better quantified by integrating range estimating and probabilistic scheduling, also known as probabilistic estimating and stochastic scheduling, using the empirical cumulative density function technique (ECDF), a graphically based technique which does not require assumptions about the underlying data distributions. Tables, diagrams, references.