Your search returned 5 results.

Sort
Results
1.
Image from Google Jackets
Experts under the 1998 Civil Procedure Rules. by Series: Arbitration and Dispute Resolution Law Journal ; (2) June 1999, 96-110(8)
Publication details: 1999
Availability: Items available for loan: London (1)Collection, call number: ABS60817.
2.
Image from Google Jackets
The proof of excusable delay in building contracts without `as-built` records by Series: Construction Law Journal ; 13(4) 1997, 243-252(10)Language: English
Publication details: 1997
Availability: Items available for loan: London (1)Collection, call number: ABS57236.
3.
Image from Google Jackets
Building on borrowed time by Series: Estates Gazette ; (9622) 1 June 1996, 106-107(2)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS55277.
4.
Image from Google Jackets
Perils of nominating under MW`80 by Series: Architects` Journal ; 197(17) 28 April 1993, 42(1)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: ABS48366.
5.
Image from Google Jackets
The swimming pool liability by Series: Architects` Journal ; 196(11) 16 September 1992, 34-35(2)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: ABS47016.