Your search returned 5 results.

Sort
Results
1.
Image from Google Jackets
Target and cost-reimbursable construction contracts Part A:A study of their use and implications by Series: CIRIA Report ; R85
Edition: Rev ed.
Language: eng.
Publication details: London CIRA 2003
Availability: Items available for loan: London (1)Collection, call number: F692.8.
2.
Image from Google Jackets
Target and cost-reimbursable construction contracts Part B: management and financial implications by Series: Report ; 85 Part BLanguage: English
Publication details: London Construction Industry Research and Infor 1982
Availability: Items available for loan: London (1)Collection, call number: F692.8.
3.
Image from Google Jackets
Target and cost-reimbursable construction contracts, Part C: preparation of contract conditions (relating to the ICE Conditions by Series: Report ; 85 Part CLanguage: English
Publication details: London Construction Industry Research and Infor 1982
Availability: Items available for loan: London (1)Collection, call number: F692.8.
4.
Image from Google Jackets
Target and cost-reimbursable construction contracts Part A: a study of their use and implications by Series: Report ; 85 Part ALanguage: English
Publication details: London CIRIA 1982
Availability: Items available for loan: London (1)Collection, call number: CIRIA REPORTS.