Your search returned 2 results.

Sort
Results
1.
Image from Google Jackets
Predicting medium term cost escalation by Series: Building Economist ; March 1996, 8-10(3)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS54871.
2.
Image from Google Jackets
Time and costs in the construction industry by Series: Building Economist ; 32(2) September 1992, 15(1)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: X289.