Your search returned 7 results.

Sort
Results
1.
Image from Google Jackets
Scheduling techniques for different project classifications by Series: Project Control Professional ; 54(2) March 2016, 17-23(7)Language: English
Publication details: 2016
Availability: Items available for loan: London (1)Collection, call number: L159227.
2.
Image from Google Jackets
Construction scheduling principles and practices by Language: eng.
Publication details: Upper Saddle River Pearson Education 2004
Availability: Items available for loan: London (1)Collection, call number: 690.0685 NEW.
3.
Image from Google Jackets
Construction project delay analysis by Series: Cost Engineering ; 38(3) March 1996, 23-27(5)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS55064.
4.
Image from Google Jackets
An integrated and proactive approach for avoiding delay claims on major capital projects by Series: Cost Engineering ; 38(6) June 1996, 37-39(3)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS55449.
5.
Image from Google Jackets
The nature and effects of construction delays by Series: Construction Management & Economics ; 11 1993, 358-369(12)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: ABS49423.
6.
Image from Google Jackets
Critical path methods in construction practice by
Edition: 4th ed.
Language: English
Publication details: New York John Wiley and Sons 1990
Availability: Items available for loan: London (1)Collection, call number: 658.4032.
7.
Image from Google Jackets
Project network analysis by Series: BRE Digest ; 53Language: English
Publication details: Garston, Watford Building Research Establishment 1976
Availability: Items available for loan: London (1)Collection, call number: ENQUIRY DESK.