Your search returned 2 results.

Sort
Results
1.
Image from Google Jackets
Pacing delays - the practical effect by Series: Cost Engineering ; 42(7) July 2000, 23-28(6)
Publication details: 2000
Availability: Items available for loan: London (1)Collection, call number: ABS62677.
2.
Image from Google Jackets
The proof of excusable delay in building contracts without `as-built` records by Series: Construction Law Journal ; 13(4) 1997, 243-252(10)Language: English
Publication details: 1997
Availability: Items available for loan: London (1)Collection, call number: ABS57236.