Damages for partial failure of contract
Language: English Series: Times ; 3 July 1995, 35(1)Publication details: 1995Subject(s): Summary: "Ruxley Electronics and Construction Ltd v Forsyth" HL 29 June 1995. The contractor has not built a swimming pool to the maximum depth specified. However, the owner was entitled to damages for loss of amenity and not the cost of reconstruction.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Law report | London Journal article | WB3126-06 (Browse shelf(Opens below)) | 1 | Available | 22175-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3125-34 Development plan | WB3125-35 Economic considerations | WB3125-36 Tree preservation order | WB3126-06 Damages for partial failure of contract | WB3126-07 Subcontractor`s bond | WB3126-22 Rectification of lease | WB3126-23 Time of the essence |
"Ruxley Electronics and Construction Ltd v Forsyth" HL 29 June 1995. The contractor has not built a swimming pool to the maximum depth specified. However, the owner was entitled to damages for loss of amenity and not the cost of reconstruction.