Damning the Severn?

By: Language: English Series: Surveyor ; 176(5175) 16 January 1992, 10-12(2)Publication details: 1992Subject(s): Summary: The Severn estuary has long been the subject of electricity-generation barrage plans. Most favoured at present is a ten mile dam from Brean Down to Lavernock Point which would generate 7% of Britain`s electricity requirement and up to 35,000 construction jobs, but the cost to the environment, assessed here, could be enormous and requires thorough investigation.

The Severn estuary has long been the subject of electricity-generation barrage plans. Most favoured at present is a ten mile dam from Brean Down to Lavernock Point which would generate 7% of Britain`s electricity requirement and up to 35,000 construction jobs, but the cost to the environment, assessed here, could be enormous and requires thorough investigation.