Lead times Oct-Dec 2006
Language: English Series: Building ; 272(8467) 16 February 2007, 68-71(4)Publication details: 2007Subject(s): Summary: Gives details of lead times for various products, including piling, concrete works, structural steel frames, precast concrete frames, cladding and roofing. The quarter to December 2006 has seen a steady increase in demand, although overall lead times have stayed the same or reduced, with the exception of curtain walling and suspended ceilings. A separate article examines archaelogical digs on construction sites.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L136726 (Browse shelf(Opens below)) | 1 | Available | 136726-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Gives details of lead times for various products, including piling, concrete works, structural steel frames, precast concrete frames, cladding and roofing. The quarter to December 2006 has seen a steady increase in demand, although overall lead times have stayed the same or reduced, with the exception of curtain walling and suspended ceilings. A separate article examines archaelogical digs on construction sites.