Your search returned 46 results.

Sort
Results
21.
Image from Google Jackets
Cost scale-up factors for airport construction by Series: Cost Engineering ; 38(2) February 1996, 24-26(3)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS54869.
22.
Image from Google Jackets
Construction project delay analysis by Series: Cost Engineering ; 38(3) March 1996, 23-27(5)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS55064.
23.
Image from Google Jackets
The top ten lessons learned in construction contracting by Series: Cost Engineering ; 38(5) May 1996, 20-24(5)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS55282.
24.
Image from Google Jackets
An integrated and proactive approach for avoiding delay claims on major capital projects by Series: Cost Engineering ; 38(6) June 1996, 37-39(3)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS55449.
25.
Image from Google Jackets
The life-cycle perspective: managing cost before it occurs by Series: Cost Engineering ; 38(10) October 1996, 35-39(5)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS56160.
26.
Image from Google Jackets
The engineering/construction industry: reengineer for survival by Series: Cost Engineering ; 37(11) November 1995, 19-25(7)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS53877.
27.
Image from Google Jackets
Contingency estimating for environmental remediation projects by Series: Cost Engineering ; 37(11) November 1995, 43-46(4)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS53886.
28.
Image from Google Jackets
Shocks, jolts and tremors by Series: Cost Engineering ; 37(11) November 1995, 31-36(6)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS53893.
29.
Image from Google Jackets
AACE International`s risk management dictionary by Series: Cost Engineering ; 37(10) October 1995, 20-25(4)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS53916.
30.
Image from Google Jackets
Roundtable on a standard method for value engineering: AACE International Annual Meeting June 21, 1994 by Series: Cost Engineering ; 37(3) March 1995, 9-21(13)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52413.
31.
Image from Google Jackets
Applying total quality management to the North American construction industry by Series: Cost Engineering ; 37(3) March 1995, 24-28(5)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52581.
32.
Image from Google Jackets
Construction Specifications Institute`s masterformat:a tool for total cost management by Series: Cost Engineering ; 36(7) July 1994, 11-17(7)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS51156.
33.
Image from Google Jackets
Prediction of repair parts budget requirement by Series: Cost Engineering ; 36(4) April 1994, 15-22(8)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS50703.
34.
Image from Google Jackets
Project budgeting for buildings by Series: Cost Engineering ; 36(12) December 1994, 13-18(6)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS52041.
35.
Image from Google Jackets
Intelligent cost/schedule estimation for modular construction by Series: Cost Engineering ; 35(6) June 1993, 19-25(7)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: ABS48909.
36.
Image from Google Jackets
Conceptual and early design estimating techniques for building heating, ventilation, and air conditioning systems by Series: Cost Engineering ; 35(11) November 1993, 25-36(12)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: ABS49743.
37.
Image from Google Jackets
Consultant cost control in the Pacific Rim by Series: Cost Engineering ; 34(1) January 1992, 17-24(8)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: ABS45767.
38.
Image from Google Jackets
Duration analysis by Series: Cost Engineering ; 34(2) February 1992, 9-14(6)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: ABS46155.
39.
Image from Google Jackets
Risk management - Back to basics by Series: Cost Engineering ; 34(12) December 1992, 7-12(6)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: ABS47776.
40.
Image from Google Jackets
Taking the adventure out of Soviet joint ventures by Series: Cost Engineering ; 33(1) January 1991, 13-17(5)Language: English
Publication details: 1991
Availability: Items available for loan: London (1)Collection, call number: ABS43996.